空壓(yā)機(jī)長(zhǎng)期停(tíng)放注(zhù)意事(shì)項
2018-11-23 10:17:34 點擊(jī):
空(kōng)壓機(jī)的停用(yòng)在(zài)各個(gè)單(dān)位都常(cháng)有發(fā)生。那麼在初次(cì)開機前空(kōng)壓機(jī)停放時(shí)間(jiān)超過三個月或空壓(yā)機停用(yòng)時(shí)間超(chāo)過三個月,再次(cì)開機前需要采(cǎi)取有(yǒu)效措(cuò)施,bi須(xū)先請專業空壓(yā)機人(rén)員對機器(qì)進行保(bǎo)養檢測,制定(dìng)安全措施(shī),避免開機(jī)後發生不(bú)良狀況。
the shutdown of air compressors often occurs in various units. then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. before the second start-up, effective measures need to be taken. the bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先(xiān)檢查電路(lù)狀态(tài),是否(fǒu)正常供電(diàn),電壓是否穩定;測量電(diàn)動(dòng)機絕(jué)緣電阻(zǔ),數(shù)值大于1mΩ。
1. check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; measure the insulation resistance of the motor, the value is greater than 1m.
2、檢查空壓機(jī)配件上是(shì)否含有積水,灰(huī)塵,及時清理(lǐ)。
2. check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣(qì)口,出(chū)氣口(kǒu)全面檢測,防止發生(shēng)堵塞現象
3. overall inspection of intake and outlet to prevent blockage
4、在(zài)上述都已經(jīng)完成(chéng)的情(qíng)況(kuàng)可以接通電(diàn)源(yuán),查看電腦控制器(qì)是否(fǒu)正常運行(háng)
4. if all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換(huàn)三濾和潤(rùn)滑油(yóu)。因為(wéi)在長期不(bú)用的(de)情況(kuàng)下,三(sān)濾(lǜ),油(yóu)可能發生(shēng)老化現象(xiàng),從而造成空(kōng)壓(yā)機開機運行時(shí)間不(bú)長即結(jié)膠積碳(tàn)或堵塞(sāi),油路不(bú)暢使(shǐ)空壓(yā)機主機或(huò)其他(tā)零部(bù)件損(sǔn)壞(huài)。
5. replace three filters and lubricants. because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專(zhuān)業人員試機,電路改造後(hòu)人(rén)工(gōng)控制(zhì)加載卸載(zǎi),先空載運行10分鐘以(yǐ)上,檢測(cè)各項指(zhǐ)标和(hé)震動、噪音等正常,再進行(háng)加載(zǎi),查(chá)看各部(bù)件運行正常即可。
6. professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
the shutdown of air compressors often occurs in various units. then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. before the second start-up, effective measures need to be taken. the bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先(xiān)檢查電路(lù)狀态(tài),是否(fǒu)正常供電(diàn),電壓是否穩定;測量電(diàn)動(dòng)機絕(jué)緣電阻(zǔ),數(shù)值大于1mΩ。
1. check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; measure the insulation resistance of the motor, the value is greater than 1m.
2、檢查空壓機(jī)配件上是(shì)否含有積水,灰(huī)塵,及時清理(lǐ)。
2. check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣(qì)口,出(chū)氣口(kǒu)全面檢測,防止發生(shēng)堵塞現象
3. overall inspection of intake and outlet to prevent blockage
4、在(zài)上述都已經(jīng)完成(chéng)的情(qíng)況(kuàng)可以接通電(diàn)源(yuán),查看電腦控制器(qì)是否(fǒu)正常運行(háng)
4. if all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換(huàn)三濾和潤(rùn)滑油(yóu)。因為(wéi)在長期不(bú)用的(de)情況(kuàng)下,三(sān)濾(lǜ),油(yóu)可能發生(shēng)老化現象(xiàng),從而造成空(kōng)壓(yā)機開機運行時(shí)間不(bú)長即結(jié)膠積碳(tàn)或堵塞(sāi),油路不(bú)暢使(shǐ)空壓(yā)機主機或(huò)其他(tā)零部(bù)件損(sǔn)壞(huài)。
5. replace three filters and lubricants. because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專(zhuān)業人員試機,電路改造後(hòu)人(rén)工(gōng)控制(zhì)加載卸載(zǎi),先空載運行10分鐘以(yǐ)上,檢測(cè)各項指(zhǐ)标和(hé)震動、噪音等正常,再進行(háng)加載(zǎi),查(chá)看各部(bù)件運行正常即可。
6. professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.